Specified first
The thinking happens before the order.
Equipment supply and technical design, in London.
Tero Energy Limited works across four registered activities: wholesale of other machinery and equipment (SIC 46690), non-specialised wholesale trade (SIC 46900), specialised design activities (SIC 74100) and other professional, scientific and technical activities not elsewhere classified (SIC 74909). The office is at Camberley Avenue in London SW20.
Those four sit together more naturally than the list suggests. Most problems with equipment are specification problems: the wrong size, the wrong duty, the wrong interface with what is already installed. A supplier who only takes part numbers cannot catch that, and a designer who never sees lead times will specify something nobody can get.
So we do the specification work and the supply. Requirements are turned into a specification, checked against what is actually available, priced with real lead times and then delivered — to site or to your stores, consolidated where that saves you handling it twice.
Send us a drawing, a schedule or just a description of the problem, and we will come back with what we would supply and what it would cost.
The thinking happens before the order.
Quoted from availability, not optimism.
We say when something will not work.